Detailed Report · as of 06/26

25 West

25 West-A (East) Wing — Mount Mary, Bandra West free-sale component of an SRA slum-rehabilitation scheme

MahaRERA P51800028736 · Promoter 25 West Realty Pvt Ltd (ex-Avdharna; Hubtown lineage) · JDA NHP Realty LLP · Apt 1803 ~Rs.21.19 Cr

INVESTIGATEas of 06/26 Strong product, weak wrapper — clean title and an excellent apartment, but a misrepresenting render and a developer whose recent delivery is anything but clean.

Almost everything about the apartment is good — clear sale title, a building CC'd to its full height, a ~86% layout, an uncharged private lobby and a free enclosed deck, and a south/south-west Sea-Link view a low sewage plant out front keeps open for life.

INVESTIGATE. The home is genuinely good — clear sale title, a building CC'd to its full height, a ~86% layout, an uncharged private lobby and a free deck, and a south/south-west Sea-Link view a low sewage plant out front will keep open for life. What holds it back is not the flat but the delivery record and the marketing: '25' is new luxury branding over a muddled Hubtown history (25 South stalled until Wadhwa stepped in; 25 Downtown leans on Oaktree distressed capital), and the hero render paints parkland over the ~20-34-floor SRA and sale towers that actually wall the west and north below the 20th floor. Resolve ring-fenced financing, the Dec-2027 vs 2032 phasing and the Ashiana-tower plan — and buy only an upper-floor south/south-west unit — before committing.

Reading the Rexray verdict
Buy — clears the bar — no hard-stop, and the fundamentals hold upShortlist — strong fundamentals, with named trade-offs to accept with eyes openInvestigate — real merits, but specific open questions to resolve before you commitSkip — a hard-stop issue — pass regardless of how good the apartment isSkip · revisit — a hard-stop that could clear — recheck in ~6 months or at the OC
The five things that decide it
1The hero render paints green parkland over the ~20-34-floor SRA and sale towers that wall the west and north below ~F20 — the sea view is honest only to the south/south-west and the upper floors.
2The developer is the risk, not the flat — '25' is new luxury branding over a muddled Hubtown record (25 South stalled until Wadhwa stepped in; 25 Downtown leans on Oaktree distressed capital).
3The dates don't line up — the East Wing is due Dec-2027 (not the marketed 2026), the West Wing runs to 2032, and one tower is effectively 'dead' behind an SRA built in front of it.
4The view is real but directional — south/south-west open for life (a low sewage plant keeps it open), west and north walled below ~F20. Buy up and buy S/SW.
5The apartment itself is excellent — clean sale title, Commencement Certificate'd to full height, ~86% layout, an uncharged private lobby and a free enclosed deck.
FVL — Rexray's index · F Fundamentals · V Value · L Livability · each pillar is the average of its scored attributes, scored 0–10: Weak (<4) · Mixed (4–6) · Fair (6–7.5) · Strong (7.5+) · the verdict is set separately, by hard-stop rules

Fundamentals

4.4/10Mixed

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

Clear Title6.5/10
Clean sale title — on a Government slum-rehab scheme
  • Free-sale title is clear and marketable — two advocates, NIL/None qualifying remarks.
  • The land is a Government slum-rehabilitation scheme; the developer holds development rights plus ownership of the sale component.

Six disclosed court cases are all rehab-side (slum-dweller eligibility/eviction), declared settled and pending withdrawal — they don't touch your sale title.

This is the free-sale slice of an SRA scheme on a 7-sub-plot master layout — the title is clean, but you're buying into a slum-rehabilitation compound.
Where this sits across the corpus · Clear Title
Birla Niyaara (Tower Silas)9
Kalpataru One8.5
25 Downtown (Hubtown)8
Rustomjee Crown8
Embassy Citadel8
Sugee Marina Bay7
Runwal Raaya6.2
Godrej Trilogy6
Prestige Nautilus5
Sugee SeaKrest5
What to ask the builder
  • Show the SRA approvals and confirm the sale component's title is free of the rehab-side litigation.
Understand “Clear Title” on the X-Ray page ↗
Delivery4.0/10
The watch-item — a muddled Hubtown delivery record
  • The dominant risk. '25' is a new luxury brand over a muddled Hubtown record: 25 South stalled until Wadhwa was brought in to finish, and 25 Downtown's capital comes through Oaktree, a distressed fund.
  • The building is Commencement Certificate'd to full height (a real positive), but the question is who finishes it and with whose money.
Where this sits across the corpus · Delivery
Birla Niyaara (Tower Silas)6.5
Kalpataru One5.5
Sugee SeaKrest4.5
Godrej Trilogy4.5
25 Downtown (Hubtown)3.5
Embassy Citadel3.5
Prestige Nautilus3
Runwal Raaya2.5
What to ask the builder
  • What ring-fenced financing secures 25 West's completion, and what is the group's OC track record?
Understand “Delivery” on the X-Ray page ↗
Developer Compliance5.0/10
RERA filing is average and incomplete

The MahaRERA filing is AVERAGE/incomplete — detailed floor layouts not submitted, the commencement-certificate table is blank on the portal (despite a Commencement Certificate existing), and the developer has opened three 2026 cases against its own allottees.

Where this sits across the corpus · Developer Compliance
Birla Niyaara (Tower Silas)8
Embassy Citadel7.5
Godrej Trilogy7
Kalpataru One7
25 Downtown (Hubtown)7
Sugee Marina Bay6
Rustomjee Crown6
Prestige Nautilus4
Sugee SeaKrest4
Runwal Raaya3
What to ask the builder
  • Why is the CC table blank on the portal, and what are the three 2026 promoter-vs-allottee complaints about?
Understand “Developer Compliance” on the X-Ray page ↗
Brochure-vs-Reality2.0/10
The hero render paints parkland over real towers

The deck's page-2 aerial ('Experience opulent living by the sea') renders continuous green parkland in the west/north foreground — exactly where the Aai Kadheshwari SRA (sale+SRA, ~20F) and West Shore (D&A Realty, 34F) actually stand.

  • That is affirmative misrepresentation (the strongest transparency tier), not a passive omission: greenery is drawn in place of the very towers that wall the west and north below ~F20.
  • Treat the marketing imagery as unreliable on surroundings.
Understand “Brochure-vs-Reality” on the X-Ray page ↗

Value

7.6/10Strong

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

View8.0/10
South-west sea view for life; west/north walled below ~F20

Distrust the hero render: the deck shows parkland where ~20-34-floor SRA and sale towers actually wall the west and north (see Top-5 #1). Here is the field-verified reality, by aspect:

  • SOUTH / SOUTH-WEST: open over the Bandra-Worli Sea Link and Arabian Sea, and protected for life — the only thing in front is a sub-5-storey sewage plant that sits below your sightline.
  • WEST: walled up to about the 20th floor by the Aai Kadheshwari SRA (a sale-plus-rehab mass directly in front); clears above ~F20.
  • NORTH / NORTH-WEST: blocked on the lower floors by West Shore (D&A Realty, 34 floors); clears around the 13th floor.
  • EAST / NORTH-EAST: blocked by Rustomjee Cliff Tower (26 floors) — not a sea aspect.
  • Net: buy UP and buy SOUTH/SOUTH-WEST for the durable view.
  • The marketed 'uninterrupted Arabian Sea' holds for S/SW and the upper floors, not for the lower west/north.
  • Scoring (ratified): 8/10 for upper-floor S/SW units, 4/10 for lower west/north.
Today: South/south-west Sea-Link view open; west/north walled below ~F20 by the in-front SRA and West Shore.By 2032: S/SW stays open for life (the low STP can't grow); a planned tallest tower on the Ashiana plot could add an east/south-east block.
25 West — site & surroundings (legend below)
25 West site map
SRA buildings (~20 floors)
One of Mumbai's largest sewage-treatment plants
25 West — East (A) Wing (between the SRA blocks)
25 West — West (C) Wing (towards the sea)
Proposed DP road
Where this sits across the corpus · View
Godrej Trilogy10
25 Downtown (Hubtown)10
Sugee Marina Bay7
Embassy Citadel5
Kalpataru One4
Prestige Nautilus3
Sugee SeaKrest3
Birla Niyaara (Tower Silas)3
Rustomjee Crown3
Runwal Raaya3
What to ask the builder
  • Confirm the exact floor and aspect of the unit — the view is only durable above ~F20 and to the south/south-west.
Understand “View” on the X-Ray page ↗
Layout & Living7.5/10
Efficient ~86% layout with a bonus lobby and a free deck
  • An efficient luxury plate (~86%): three large 4BHKs around a central core, enclosed decks included (and free), and an uncharged private lobby per apartment via a private-lift layout.
  • The apartment itself is a clear positive.
Where this sits across the corpus · Layout & Living
Kalpataru One9.5
Sugee SeaKrest8.5
Rustomjee Crown8.0
Runwal Raaya8.0
Prestige Nautilus7.5
25 Downtown (Hubtown)7.5
Birla Niyaara (Tower Silas)7.0
Embassy Citadel6.5
Godrej Trilogy6.0
Sugee Marina Bay6.0
What to ask the builder
  • The west-face glass specification — brand, glazing thickness, and the heat-trapping (SHGC / U-value) number.
Understand “Layout & Living” on the X-Ray page ↗
Non-RERA Area9.0/10
No restricted-area trap — the private lobby is a genuine bonus
  • No restricted-common-area problem.
  • The private lobby is a genuine bonus (not in your RERA area, not charged, and via a private-lift layout each flat gets its own — the Nautilus pattern), and the ~23 sqm enclosed deck is counted as RERA area and not charged separately.
Where this sits across the corpus · Non-RERA Area
Sugee SeaKrest10
25 Downtown (Hubtown)10
Godrej Trilogy9
Kalpataru One9
Sugee Marina Bay9
Birla Niyaara (Tower Silas)9
Embassy Citadel9
Prestige Nautilus8
Runwal Raaya6.5
Rustomjee Crown2
What to ask the builder
  • Confirm in writing that the private lobby and deck carry no separate charge.
Understand “Non-RERA Area” on the X-Ray page ↗
Pricing6.0/10
Rs.71k registered is a stale price; the market is Rs.90k-1.3L
  • Registered at ~Rs.71,000/sqft on RERA carpet — but that is a stale, early-phase agreement price; the current Mount Mary / Bandra Reclamation field range is ~Rs.90,000-1,30,000/sqft (effective ~Rs.1.05-1.51L via the 86% layout).
  • Transactions are largely full-cheque (minimal cash).

Units run from ~2,217 sqft up to 5,000+ sqft jodis on the high East Wing floors, with the West Wing and Aashiana Tower D to follow.

What to ask the builder
  • What is the all-in cost — including stamp duty, registration and goods-and-services tax (GST)?
  • What is the rate on the area I actually own (carpet plus deck) versus the marketed area?
  • What have recent apartments in this building / micro-market actually registered at?
Understand “Pricing” on the X-Ray page ↗

Livability

6.4/10Fair

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

Compound Density5.0/10
A multi-tower SRA compound, not a boutique tower
  • A multi-tower compound, not a boutique tower: the East Wing, a 'dead' Tower B (an SRA built in front of it), a West Wing due 2032, a planned tallest third tower on the adjacent Ashiana plot (Tower D), plus the rehab buildings on the same master layout.
  • Density and shared-compound load are real; exact rehab counts pending.
Where this sits across the corpus · Compound Density
Rustomjee Crown9
Kalpataru One7
Sugee SeaKrest6
Birla Niyaara (Tower Silas)6
Sugee Marina Bay5
Prestige Nautilus4
Embassy Citadel4
Runwal Raaya3
25 Downtown (Hubtown)2
Godrej Trilogy1
What to ask the builder
  • Show the full master-layout: all sale towers, the rehab buildings, and the Ashiana-plot tower.
Understand “Compound Density” on the X-Ray page ↗
Neighbourhood5.0/10
A sewage plant and an SRA right out front
  • In front to the south/south-west: a proposed sewage-treatment plant plus a garden reservation — it keeps the view open, but the sewage treatment plant is an odour risk.
  • Around you: the Aai Kadheshwari SRA, West Shore (34F), and other Bandra-West towers.

The big upside is access: a proposed Development Plan road off the Bandra-Worli Sea Link flyover would transform the commute (see Access).

Where this sits across the corpus · Neighbourhood
25 Downtown (Hubtown)7
Sugee Marina Bay6
Prestige Nautilus5
Sugee SeaKrest5
Godrej Trilogy4
Rustomjee Crown4
Birla Niyaara (Tower Silas)3
Embassy Citadel3
Runwal Raaya2
Kalpataru One1
What to ask the builder
  • What is the STP's operating status and odour-mitigation, and is the garden reservation secured?
Understand “Neighbourhood” on the X-Ray page ↗
Peak-Hour Connectivity5.5/10
18 minutes today — potentially 3 with the new Development Plan road
  • About 18 minutes today (late-morning) to the coastal road / Sea Link from Mount Mary — and potentially ~3 minutes if the proposed Development Plan road off the Sea-Link flyover is built.
  • A big upside, but build-contingent.
Fixable? Builders like to sell connectivity as kilometres from a landmark — but the real test is time, not distance: how long you would actually be stuck, at peak hour, just getting to a fast arterial like a Sea Link or Coastal Road on-ramp. The access route and the on-ramp are municipal and outside the developer's control, so there is no fix to offer — only an honest read of the peak-hour reality today and the area's trajectory by 2032, once the surrounding pipeline has built out.
Where this sits across the corpus · Peak-Hour Connectivity
Sugee Marina Bay9
Godrej Trilogy8
Prestige Nautilus7
Sugee SeaKrest7
25 Downtown (Hubtown)7
Rustomjee Crown5
Embassy Citadel5
Runwal Raaya5
Kalpataru One2
Birla Niyaara (Tower Silas)2
What to ask the builder
  • Is the proposed Sea-Link-flyover DP road sanctioned, and on what timeline?
Understand “Peak-Hour Connectivity” on the X-Ray page ↗
Kitchen Ventilation9.0/10
Kitchen ventilation passes

Kitchen ventilation PASSES — the kitchen sits on the building's outer wall with an adjacent utility opening to outside air. Good for daily Indian cooking.

Where this sits across the corpus · Kitchen Ventilation
Prestige Nautilus9
Sugee SeaKrest9
Kalpataru One9
Sugee Marina Bay9
Birla Niyaara (Tower Silas)9
25 Downtown (Hubtown)9
Rustomjee Crown9
Runwal Raaya9
Embassy Citadel8
Godrej Trilogy6
Understand “Kitchen Ventilation” on the X-Ray page ↗
Lift Wait7.0/10
Lift wait is comfortably Grade B

Elevator wait is Grade B (comfortably appropriate for this price) — four lifts serving 23 floors at three flats per floor is generous; the wait stays good even on conservative lift-speed assumptions.

Four passenger lifts, three flats per habitable floor, 23 floors — morning-peak wait stays in the 27-34s (Grade A-B) band.
Understand “Lift Wait” on the X-Ray page ↗
Water Adequacy5.5/10
Water adequacy is a WARN (on-site sewage plant)
  • Water adequacy is a WARN — the sanctioned and agreement unit counts match (no floor area (FSI)-uplift gap), but the slum-rehab scheme has an on-site sewage plant (a lower municipal entitlement) and the agreement references tanker supply.
  • The the agreement boundary schedule itself adjoins the sewage-treatment plant.
Where this sits across the corpus · Water Adequacy
Sugee SeaKrest8
Sugee Marina Bay8
Birla Niyaara (Tower Silas)7
Godrej Trilogy6
Kalpataru One6
25 Downtown (Hubtown)5
Prestige Nautilus4
Rustomjee Crown4
Runwal Raaya4
What to ask the builder
  • Show the hydraulic-engineer water NOC and the assured daily water supply per flat.
Understand “Water Adequacy” on the X-Ray page ↗
Build Planning & Qualitynot yet scored
A checklist to verify with the builder — Rexray will score this attribute as the field database grows.

Rexray's database will, over time, be enriched with the attention to detail and quality ethos of each builder. For now, below is the checklist you should verify with the builder before you decide.

What to ask the builder
  • Who's the architect, and what comparable have they delivered?
  • Do the lobbies need lights during the day?
  • Gym/pool/lobby sized for how many residents? (gym sqft / residents)
  • Does this unit's layout meet your Vastu requirements (entry, kitchen, master)?
  • Can a fire tender or an ambulance reach the lobby?
  • Who is actually building it?
  • Mivan or conventional — and how are the tie-holes grouted and cracks controlled?
  • What's the realistic floor-cycle, and how does the monsoon factor in?
  • Which steel/cement? Facade glazing spec? MEP contractor? STP/solar?
  • Which marble/fittings exactly? Which window system? VRV brand?
  • Deck/bathroom waterproofing system? How's the facade sealed into the structure?
  • Gypsum or block internal walls — and are the party walls insulated?
  • Does the back-up generator power my whole flat, or only the common areas?
  • Is the parking solo, tandem, or a mechanical stack — and how wide are the bays?
Understand “Build Planning & Quality” on the X-Ray page ↗
Community7.5/10
Likely a professional-dominant building

Likely a professional-dominant building — clean/largely full-cheque transactions at a high absolute price (Rs.90k-1.3L/sqft) with large units (2,217 to 5,000+ sqft jodis) and a listed-developer lineage point to salaried/institutional buyers and a structured committee culture.

What to ask the builder
  • What is the ticket-size range in the building — the gap between the cheapest and the most expensive home?
  • Is the building vegetarian-only, or skewed to a single community?
  • Is it owner-occupied, or investor- and tenant-heavy?
  • What is the pet policy?
Understand “Community” on the X-Ray page ↗

Findings register

16 findings · severity-ranked

Every marketed claim set against the documented fact, sourced. Critical and high first.

HIGH
Stale/false the marketing renders — deck renders parkland where ~20-34 floors SRA/sale towers wall the W/N (marketing misrepresentation)
MarketedAerial the marketing renders showing the tower amid open green parkland with an uninterrupted sea foreground
DocumentedThe page-2 aerial renders continuous greenery in the west/north foreground where the Aai Kadheshwari SRA (sale+SRA, ~20 floors) and West Shore (34 floors) actually stand/are sanctioned — the towers that wall the W/N below ~F20. This is affirmative false depiction (parkland shown in place of real towers), the strongest transparency tier (MISREPRESENTED), reinforcing Hubtown's surroundings-suppression R2R pattern.
The hero the marketing renders paints parkland over the very SRA and 34-floor towers that block the west/north — the sea view is real only to the south/south-west and the upper floors.
Source: marketing, REXRAY-FIELD
MED-HIGH
Possession — East Wing (Tower A) Dec-2027 governs; West Wing (Tower C) Jun-2032; Tower B 'dead'; marketing 2026 optimistic
MarketedCompletion by January / December 2026
DocumentedField-verified: Tower A (East Wing, THIS registration) governing possession 31-Dec-2027 (the agreement); Tower C (West Wing) 30-Jun-2032 (= RERA original); Tower B is a 'dead tower' (Aai Kadheshwari SRA in front). Marketing's Jan/Dec-2026 was optimistic. ~70% complete Jun-2026. Confidence tempered by Hubtown's muddled delivery (see 25W-INTAKE-12).
For the East Wing the governing date is Dec-2027 (not the marketed 2026); the West Wing runs to 2032 and one tower is effectively dead — phasing the deck doesn't show.
Source: registered documents, marketing, REXRAY-FIELD
MED-HIGH
Developer delivery history muddled — 25 South stuck (Wadhwa pulled in); 25 Downtown capital via Oaktree (distressed)
Marketed'25' premium luxury brand
Documented'25' is new luxury branding over a muddled Hubtown track record: 25 South was stuck and Wadhwa had to be pulled in to finish; 25 Downtown's capital is via Oaktree (a distressed fund). Delivery is 'not the cleanest/safest.'
The '25' luxury brand sits on a shaky Hubtown delivery record — a stalled sister project rescued by another builder and distressed-fund capital elsewhere.
Source: REXRAY-FIELD, secondary sources
MEDIUM
SRA slum-rehabilitation scheme with 6 disclosed litigations (slum-dweller cases on rehab component)
MarketedMount Mary luxury address (litigation absent from deck)
Documented6 matters on MahaRERA — all slum-dweller cases on the SRA rehab component (eligibility, eviction, water/electricity reconnection). Developer declares each settled & pending withdrawal, no impact on sale title; both title certificates NIL/None qualifying remarks.
The six court cases are slum-dweller disputes on the rehab side, declared settled and pending withdrawal; title for the sale flat is certified clear.
Source: registered documents, government filings, secondary sources
MEDIUM
SRA incentive/Transfer of Development Rights floor area (FSI) on a small sale sub-plot; plot-area discrepancy across documents
DocumentedSanctioned BUA 16,124.35 sqm on a ~1,099.96-1,495.59 sqm SALE sub-plot (implied ~14.7), reflecting SRA incentive/Transfer of Development Rights floor area (FSI) off the 15,205.60 sqm scheme land. the agreement reserves future floor area (FSI) to promoter. Plot area differs across RERA / consent / title.
The high sanctioned area is SRA incentive floor area (FSI) on a small sale plot; documents quote three different plot areas — reconcile before relying on any single figure.
Source: registered documents, government filings
MEDIUM
SRA compound (IPD) — sale building is Sub-Plot 1 of a 7-sub-plot scheme; rehab absent from marketing
MarketedStandalone luxury 'homes by the stars'
DocumentedThe sale building occupies the First Sub-Plot of an SRA Master Layout; rehab of displaced dwellers sits on other sub-plots of the same scheme — shared access/footfall/celebration-noise context not shown in the deck.
The luxury tower is the sale slice of a larger slum-rehab scheme; the rehab buildings on the same master layout aren't in the marketing.
Source: registered documents, government filings
MEDIUM
View FIELD-VERIFIED — S/SW open for life; W & N walled <=F20 (Aai Kadheshwari SRA + West Shore 34 floors); marketing 'uninterrupted' partly contradicted
MarketedUninterrupted panoramic Arabian Sea view
DocumentedFIELD-verified (raycast cross-check matches): S/SW Sea-Link/Arabian-Sea view OPEN FOR LIFE (only a <5 floors sewage treatment plant in front, below sightline); W walled <=F20 by Aai Kadheshwari SRA (sale+SRA), N blocked on lower floors by West Shore 34 floors (clears ~F13), E/NE by Cliff 26 floors. Marketed 'uninterrupted Arabian Sea' holds for S/SW + upper floors, not W/N lower floors.
The south/south-west sea view is protected for life; the west and north are walled off below ~F20, so the 'uninterrupted' claim is true mainly for S/SW and the upper floors.
Source: REXRAY-FIELD, marketing
MEDIUM
Proposed sewage treatment plant (sewage purification plant) + garden directly in front (S/SW) — View non-event but HIGH SRD odour/nuisance
Marketed'Opulent living by the sea' (sewage treatment plant not shown)
DocumentedA proposed sewage treatment plant (<5 floors) + garden reservation sits directly in front to the S/SW. DUAL-LENS: it keeps the S/SW open for the View (below sightline) but is a HIGH SRD item (odour/nuisance) and the reason the premium south view stays open for life.
The thing that keeps the south sea view open for life is a low sewage-treatment plant in front — great for the view, but an odour/nuisance neighbour.
Source: registered documents, government filings, REXRAY-FIELD
MEDIUM
Own future 3rd (tallest) tower planned on the 'Ashiana' plot — intra-plot density + E/SE view-threat
MarketedBoutique compound
Documented25 West is planning a third — and tallest — tower on the adjacent 'Ashiana' bungalow plot within the same compound: an intra-plot density addition and a potential E/SE view-threat, not shown in current marketing.
A future, taller third tower is planned on the compound — more density and a possible new view block to the east/southeast.
Source: REXRAY-FIELD
LOW-MED
Brand vs Promoter — '25 West' (NHP/Diviniti; Hubtown lineage) vs promoter 25 West Realty Pvt Ltd (ex-Avdharna)
Marketed'25 West' / Hubtown brand
DocumentedRERA promoter = 25 West Realty Pvt Ltd (ex-Avdharna, originally Hubtown's slum business) + NHP Realty LLP revenue-share JDA; current marketing carries NHP/Diviniti branding. Recourse runs to the SPV, not 'Hubtown'.
The flat is sold by an SPV with a JDA partner; 'Hubtown' is upstream lineage, not the contracting promoter.
Source: registered documents
LOW-MED
Floor-count presentation — '33 storeys' counts podium/amenity; 23 habitable, Commencement Certificate to 23 (NOT under-sanction)
Marketed33-storey tower
Documented'33 storeys' = 7 podium parking + 8th lobby + 9-10 amenity + 23 habitable. RERA lists 25 all-levels / 23 habitable, Commencement Certificate to 23. The full habitable height the buyer pays for IS Commencement Certificate-cleared — NOT the SeaKrest/Marina-Bay pattern; gap is definitional.
Unlike the corridor's 60-vs-33 cases, 25 West's '33 storeys' is podium+amenity+23 habitable, and Commencement Certificate already covers the full habitable build.
Source: registered documents, government filings, marketing
LOW-MED
RERA filing currency — Commencement Certificate/NA table blank despite Commencement Certificate to 23 floors; 3 new 2026 promoter-vs-allottee complaints
DocumentedPortal Commencement Certificate/NA-order table is empty although a Commencement Certificate to 23 floors exists (the agreement Annexure D + building-details row) — upload gap. Five complaints: two older (Avdharna vs Ajwani, Order Approved 2022) and three new 2026 filed BY 25 West Realty against allottees — Hearing Scheduled.
The RERA page omits the Commencement Certificate documents and shows the promoter has opened three 2026 cases against its own buyers — worth understanding before purchase.
Source: registered documents
LOW-MED
Buyer-adverse standard-form contract terms (force majeure, default-extends-possession, liquidated damages, Part-OC possession, parking deferral)
DocumentedStandard developer-favourable terms: broad force majeure, possession extends on allottee default, liquidated damages = earnest money + interest, possession may be on Part-OC, parking may not be ready at possession without buyer recourse.
The agreement carries the usual builder-tilted clauses — broad force majeure, part-OC possession, and parking that can lag handover.
Source: registered documents
LOW
Attached 23.44 sqm = enclosed deck/balcony (RERA area, uncharged) — Bucket 2, NOT an RCA finding
MarketedLarger 'total' carpet (marketing Unit-3 = 3,226 sqft ~ carpet+attached)
DocumentedFIELD: the 23.44 sqm 'attached area' is the ENCLOSED DECK/BALCONY and counts as RERA area; disclosed and NOT charged separately (bonus). Per methodology 6C2, a disclosed deck/balcony is Bucket 2 (what the buyer buys) — NOT an RCA finding.
The ~23 sqm 'attached area' is an enclosed deck counted in RERA area and not charged separately — a normal feature, not a restricted-common-area problem.
Source: registered documents, REXRAY-FIELD
POSITIVE
Private lobby = lobby-as-bonus (Nautilus pattern) — uncharged, private-lift config; NOT an RCA/BMC risk
MarketedPrivate lobby per residence
DocumentedFIELD: the per-apartment Private Lobby is NOT in RERA area and NOT charged (bonus); despite 3 flats/floor, the private-lift configuration gives each apartment its own private lobby — the Nautilus lobby-as-bonus POSITIVE, not the Crown multi-flat exclusive-lobby BMC risk.
Each flat gets an uncharged private lobby via a private-lift layout — a bonus (Nautilus-style), not a charged or BMC-exposed common-area carve-up.
Source: registered documents, REXRAY-FIELD
POSITIVE
Access — 18 min today, ~3 min with the proposed BWSL-flyover Development Plan road (contingent positive)
MarketedConnectivity to Sea Link
DocumentedRHARC today ~18 min (11am weekday) from Mount Mary to coastal-road/Sea-Link access; a proposed Development Plan road off the Bandra-Worli Sea Link flyover would cut this to ~3 min — a large but build-contingent upside.
Access is ~18 minutes today but could drop to ~3 minutes if the proposed Sea-Link-flyover Development Plan road is built — a big, if uncertain, upside.
Source: REXRAY-FIELD, government filings
Five questions to ask before you commit
  1. What ring-fenced financing guarantees completion, given 25 South stalled and 25 Downtown runs on distressed-fund capital?
  2. Is the East Wing's Dec-2027 possession firm while the West Wing runs to 2032 — and where is the OC?
  3. Which floors and which aspect am I buying? Confirm the south/south-west view and that I'm above ~F20 for the west/north.
  4. What is the sanction status, height and timeline of the planned tallest tower on the 'Ashiana' (Tower D) plot?
  5. Will the proposed Sea-Link-flyover Development Plan road actually be built — and what is the sewage treatment plant's odour-mitigation plan?
Rexray — Real Estate X-Ray. This is a research view built from registered documents, government filings, and Rexray field analysis; it is not legal, financial, or investment advice. Verify every figure against the source documents before you transact.