Freehold redevelopment · two towers of 45 floors · 233 homes · full occupation certificate May 2025 · N. M. Joshi Marg, Byculla
The five things that decide it
1A full occupation certificate has covered both towers since May 2025 - the building is finished, largely occupied, and can be walked through before anyone commits a rupee.
2The two towers are the same height, ninety metres apart, so the inward-facing homes look straight at each other at every floor, and no premium and no height buys a way out of it.
3The west aspect is the only one with sea in it, a 259-metre tower already blocks its slice, and a 300-metre tower is sanctioned on the same bearing.
4The lowest habitable floor in the building already sold at about Rs 46,700 a foot, so everything above that price buys height and open sky on the two arcs that have towers sanctioned in them.
5Two ordinary passenger lifts serve 45 floors in each tower; the marketed count of four high-speed elevators includes the fire lift and the evacuation lift.
Livability
5.3/10MixedPillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.
Compound Density3.5/10
Four structures and 299 households on two acres - all approved, barely disclosed
- The compound holds 233 sale homes plus 66 inclusive-housing tenements - 299 households on 8,692 square metres, about 139 households an acre.
- They sit in FOUR structures: two 45-storey towers, a parking podium of ground plus seven decks with the clubhouse on its roof, and a ten-storey inclusive-housing wing at the street end.
- Recreational open space is 2,459.77 square metres and the towers stand nine to ten metres from the north and south boundaries.
- None of that is irregular and all of it is on the approved drawings - this is a legitimately dense scheme, sanctioned as such.
- The problem is disclosure.
- A buyer reading the two documents they are actually handed would not learn it: the regulator's building table names two of the four structures, and the brochure names two and then shows a third in its own hero image without labelling it, counting it or explaining what it is.
What to ask the builder- How many households share the podium, the clubhouse and the gate in total, and which structures are they in?
Understand “Compound Density” on the X-Ray page ↗Neighbourhood4.0/10
A maturing tower belt, with the pipeline pointed at the two best arcs
- The immediate neighbours are not the issue.
- The three registered abutters are low, and field observation is explicit that they leave the outward aspects open from inside the plot - which is why none of them was entered into the obstruction model on a guessed height.
What changes this neighbourhood over the next decade is the tower pipeline, and it runs at the arcs that matter:
- 7 Mahalaxmi, 509 metres due north - a sanctioned 241.9-metre tower with a 312-metre pair behind it, standing in the cleanest arc this building has today.
- L&T Mahalaxmi at 300 metres to the west, on the same bearing as the only aspect with sea in it.
- A parcel sanctioned to ground-plus-78 to the north-north-west.
- Piramal Aranya to the south-east, filling the second tower's mid-distance.
- Two things that turned out to be less serious than they first read.
- The old jail is a north-side object at distance on a different parallel road, and the field's reading is that no prisons clearance would have been required; the louvre instruction on the sanctioned parking plates is a deck-level screening measure, not a homes-level one.
- The one genuinely unanalysed candidate is the mill parcel on the southern boundary - a tower there would stand nine metres from the south face of both towers, and no sanctioned envelope for it could be found.
What to ask the builder- What is sanctioned on the mill parcel on the southern boundary, and when does 7 Mahalaxmi rise?
Understand “Neighbourhood” on the X-Ray page ↗Peak-Hour Connectivity3.5/10
Twenty-six minutes to the coastal road - the longest reading in the portfolio
- Measured on a weekday late morning, the drive to the nearest coastal-road entry node took 26 minutes.
- That is the longest figure recorded across the portfolio to date.
- For calibration, the two inland comparators - one on Malabar Hill, one in Ghatkopar - both measured 18 minutes, and the Worli Sea Face properties measure one to three.
- This is a fact about the belt rather than a defect in the building.
- Byculla sits on the eastern spine, and the coastal road is a cross-town journey from here rather than a local one - the same will be true of every property on this frontage.
- It is also the fact a resident lives with twice a day, so it belongs in the decision rather than in a footnote.
- Worth flagging as an open calibration question: another property in this same belt currently carries a road-access score of 5.0 on an unmeasured basis, while this one is scored on an actual measurement.
- If a second eastern-spine measurement lands in the same band, road access should stop being read as a single city-wide ladder.
Fixable? Builders like to sell connectivity as kilometres from a landmark — but the real test is time, not distance: how long you would actually be stuck, at peak hour, just getting to a fast arterial like a Sea Link or Coastal Road on-ramp. The access route and the on-ramp are municipal and outside the developer's control, so there is no fix to offer — only an honest read of the peak-hour reality today and the area's trajectory by 2032, once the surrounding pipeline has built out.
What to ask the builder- What does this drive take at 9am on a Monday, and what changes when the eastern freeway connections are complete?
Understand “Peak-Hour Connectivity” on the X-Ray page ↗Kitchen Ventilation9.0/10
A kitchen on the outside wall with a service shaft and a dry balcony - the right answer
- On the approved plate the kitchen sits against the external envelope, with a service shaft and a service slab set 60 centimetres below immediately outside it, and a dry balcony adjoining.
- That is a genuine external air path and a working utility zone off the kitchen - not the sealed internal galley that traps cooking odour in the living room, which is the failure mode this attribute exists to catch.
- The specification promises piped gas into the kitchen with a gas leak detector.
- Note what the air conditioning covers and what it does not: the variable-refrigerant system is specified for living rooms and bedrooms only, so the kitchen is unconditioned.
- That is the correct outcome for cross-ventilation and should be read as a positive rather than as an omission - a sealed, conditioned kitchen is the thing to avoid.
What to ask the builder- Where does the kitchen service shaft terminate, and is it mechanically ventilated at the top?
Understand “Kitchen Ventilation” on the X-Ray page ↗Lift Wait5.0/10
Two ordinary passenger lifts for 45 floors - the marketed four include the fire lift
Each core draws four lift shafts, and two of the four are a FIRE lift and an EVACUATION lift. Ordinary passenger service is two lifts per tower, over 44 landings and a 172.90-metre rise.
- Modelled on those two lifts, the peak wait comes out at 62 to 80 seconds at luxury lift speeds and 80 to 103 seconds at more ordinary ones - the bottom grade on both readings, and the bottom grade at this price point is a finding on its own.
- Counting the fire lift as a third car, which is what happens in practice because a fire lift is an ordinary lift with fire-rated features, brings it to 41 to 53 seconds.
- Counting all four, as the marketing does, gives 31 to 40 seconds.
- In other words the marketed figure is reachable only by treating the evacuation lift as everyday transport.
- The two towers are not equal here, and the gap is large.
- The first tower puts 75 homes on its two passenger lifts; the second puts 153 on the same two, over an identical rise.
- A buyer in the second tower queues behind roughly twice the population - the same trade that makes its floor plate the more efficient of the two.
- Lift speed and rated capacity appear in no document in the file, so the range above is a model rather than a measurement, and it is one a buyer can settle in ten minutes by standing in the lobby at 8.30 in the morning.
Modelled peak wait: 62-80 seconds on the two passenger lifts, 41-53 seconds if the fire lift is counted as a third car.
What to ask the builder- What speed and capacity were the lifts installed at, and may we time a peak-hour wait in this tower?
Understand “Lift Wait” on the X-Ray page ↗Water Adequacyqualitative
Cannot be assessed - the municipal building approval is missing from the file
- This one is left open deliberately, and the reason is a missing document rather than a missing answer.
- The municipal building approval and its last amendment of 18 August 2023 are not in the file: the annexure of the registered agreement labelled 'Copy of municipal building approval' actually contains an amended-plan approval letter of 5 December 2023, bound twice.
- Without the approval itself neither the sanctioned water-connection unit count nor the hydraulic engineer's clearance condition can be read, and those two things are what decide whether the water supply was sized for the number of homes that were eventually sold.
- What is known should be said plainly rather than left as a blank.
- The architect's certified filing records rainwater harvesting as NIL.
- The specification annexure contains no rainwater harvesting, no sewage treatment plant and no water-treatment item of any kind, and the agreement mentions a treatment plant only as something the developer MAY install and charge for later.
What to ask the builder- How many water connections was the building sanctioned for, what does the hydraulic engineer's clearance require, and is any part of supply on tankers?
Understand “Water Adequacy” on the X-Ray page ↗Parking7.0/10
Drive to your own numbered bay - the best arrangement in the portfolio
- Every deck is drawn as a drive-way with a 6-metre carriageway, and the plates show SEPARATE one-way up and down ramps, each 7.5 metres wide at a one-in-ten-point-six gradient, running around a central island.
- Bays are individually numbered dedicated stalls.
- There is no car lift, no puzzle rack and no mechanical parking anywhere on the drawings, and the stamp valuation independently values mechanical parking at zero.
- That is the top of the access ladder - a resident drives to their own bay and walks to a lift.
There are enough of them. 531 bays were sanctioned for 233 homes, about 2.28 each, and the reference agreement allots THREE bays to a single home and expressly charges nothing for them - the agreement records that no price, fee or consideration was recovered for parking.
- The building was completed as ground plus seven decks rather than the nine drawn. On the only deck-by-deck table in the file that leaves roughly 428 bays against a stated requirement of 427 - essentially no surplus, where the drawings showed 95 bays of headroom. The as-built count itself is in no document.
- The agreement leaves the LEVEL and the NUMBER to the developer, to be identified at the time of offering possession, on a stack eight levels deep. Which deck a bay sits on is most of the daily experience of using it.
- There is no electric-vehicle charging provision anywhere in the specification, and retrofitting an eight-level podium is a society-level project rather than an individual one.
What to ask the builder- Which deck and which bay numbers come with this apartment, what is the bay width, and what is the route to installing a charger?
Understand “Parking” on the X-Ray page ↗Build Planning & Qualitynot yet scored
A checklist to verify with the builder — Rexray will score this attribute as the field database grows.
Rexray's database will, over time, be enriched with the attention to detail and quality ethos of each builder. For now, below is the checklist you should verify with the builder before you decide.
What to ask the builder- Who's the architect, and what comparable have they delivered?
- Do the lobbies need lights during the day?
- Gym/pool/lobby sized for how many residents? (gym sqft / residents)
- Does this unit's layout meet your Vastu requirements (entry, kitchen, master)?
- Can a fire tender or an ambulance reach the lobby?
- Who is actually building it?
- Mivan or conventional — and how are the tie-holes grouted and cracks controlled?
- What's the realistic floor-cycle, and how does the monsoon factor in?
- Which steel/cement? Facade glazing spec? MEP contractor? STP/solar?
- Which marble/fittings exactly? Which window system? VRV brand?
- Deck/bathroom waterproofing system? How's the facade sealed into the structure?
- Gypsum or block internal walls — and are the party walls insulated?
- Does the back-up generator power my whole flat, or only the common areas?
- Is the parking solo, tandem, or a mechanical stack — and how wide are the bays?
Understand “Build Planning & Quality” on the X-Ray page ↗Community5.0/10
Two different populations across the two towers, and a third in its own wing
- The two sale towers are different products for different buyers.
- The first is 75 large homes at two a floor; the second is 153 smaller homes at four a floor.
- They share one gate, one podium and one clubhouse, so the community a buyer joins is the sum of the two rather than the tower they live in.
- Separately, 66 inclusive-housing households occupy their own ten-storey wing at the street end of the same compound, with their own entrance, their own nine parking bays and, in the words of the transfer deed to the municipal corporation, 'independent exclusive facilities/amenities'.
- That is an allocation in a separate structure rather than shared-building living, so it does not raise the questions that a mixed rehousing floor would.
- Fifty-two of the 66 were transferred to the corporation by a deed of 27 December 2023; the developer retained 14, and what happens to those 14 is worth asking.
The factual position is unremarkable and common in this city. What is not defensible is that no marketing document acknowledges any part of the arrangement.
What to ask the builder- What is the ticket-size range in the building — the gap between the cheapest and the most expensive home?
- Is the building vegetarian-only, or skewed to a single community?
- Is it owner-occupied, or investor- and tenant-heavy?
- What is the pet policy?
Understand “Community” on the X-Ray page ↗
Findings register
17 findings · severity-ranked
Every marketed claim set against the documented fact, sourced. Critical and high first.
MED-HIGH
Two identical towers ninety metres apart, and each one is the other's wall
Marketed'Two towers ensconced in a gated community'; 'generously spacious residences that offer sweeping views of the city'; 'Wide wrap around windows and sprawling decks that offer sweeping views'; 'A sweep of endless views'; 'East-West facing apartments'.
DocumentedWing A and Wing B are BOTH 172.90 m and stand roughly 90 m apart on an east-west strip, with their own ten-level parking podium and clubhouse between them. Because the two tops are identical, there is no floor at which either clears the other: the inward aspect of each tower is walled by the other at EVERY floor, across roughly 22 degrees. Below that, the podium tops out at 25.60 m and the clubhouse at 34.00 m, which against a first habitable floor of 6.85 m and 3.65 m floors clears at about the 10th floor. East of Wing B the inclusive-housing wing rises 29.30 m, clearing at about Wing B's 9th.
The inward-facing homes in both towers look at the other tower, at every floor, forever.
Source: government filings, marketing
MED-HIGH
Every adhesion mechanism in the sweep is present, in one agreement
MarketedThe brochure's own disclaimer reserves the right to 'change, alter, add or delete any of the specifications... without prior permission or notice'.
DocumentedAll seven limbs of the standard sweep fire. (a) ADVANCE CONSENT: irrevocable consents to further buildings, amended layout and building plans, additional floors 'vertically or otherwise', acquisition of adjoining plots and AMALGAMATION into this layout, and to redevelopment 'even after conveyance of the Building in favour of the Organisation'. (b) DUE-DILIGENCE WAIVER: the buyer 'waives his/her/their right to raise any queries or objections' on title and encumbrances and undertakes 'not to raise any requisitions on or objections to the same, any time hereafter'. (c) ASYMMETRIC PENALTY: Liquidated Damages defined as 10% of the total consideration, forfeitable on buyer cancellation, with a SECOND 10% penalty at cl. 10.5, refunds payable 'only out of the sale proceeds arising out of the re-allotment / re-sale', buyer interest at SBI's highest MCLR plus 2% against the developer's statutory rate, and cll. 11.2.4/11.2.7 stating the buyer 'shall not be entitled to claim any interest/damages/compensation whatsoever' and waiving specific performance. (d) BROCHURE DISCLAIMER: cl. 21.1 extinguishes every representation 'arising out of any marketing material including sales brochures, models, photographs, videos, illustrations'. (e) MAINTENANCE CONTROL: the developer appoints the facility management agency, expressly including its own group companies, for at least five years and any period thereafter at its discretion, and 'is not liable to render any accounts' on the Contribution. (f) RESTRAINT ON ALIENATION: a lock-in until full payment, transfers routed 'through the Developer (with a view to maintain price parity for the Project)', and an unquantified transfer fee. (g) FIRST CHARGE: 'The Developer shall have a first and prior charge on the Flat', repeated at cll. 9.1 and 9.4.
A full house on the seven-limb sweep, and two of the limbs are unusually hard.
Source: registered documents
MED-HIGH
There is a west sea aspect, it is already blocked, and a second tower is coming on the same line
Marketed'generously spacious residences that offer sweeping views of the city'; 'A sweep of endless views'; 'East-West facing apartments'. The brochure makes NO sea claim anywhere in 34 pages and names no direction for any view.
Documented[REXRAY-FIELD] 'for Tower A, Piramal Mahalaxmi blocks a material west sea view; L&T Mahalaxmi will also block the same west view among others.' The raycast on the confirmed coordinates reproduces it independently: PIRAMAL MAHALAXMI stands 306 m due west at 259 m and walls its slice of Wing A's west arc at EVERY floor, since the subject's terrace is 172.90 m. L&T MAHALAXMI, 300 m tall, sits at 961 m on the same bearing and would do the same when built - it registers only after a defensible 55 m tower plate is supplied, because on the engine's default width it falls under the sliver threshold and disappears.
The one aspect on this plot with a sea in it is the one the neighbours have already taken.
Source: REXRAY-FIELD, government filings, marketing
MED-HIGH
The whole premium in this building is a view premium, and the views are the part with towers coming
Marketed'Sweeping views of the city', 'a sweep of endless views', 'East-West facing apartments' - 34 brochure pages that never name a direction.
DocumentedThe last developer sale on record - Rs 102,241,016 for 2,190 sq ft RERA carpet, Rs 46,686 per sq ft, registered 12/03/2026 - bought the SECOND floor of Wing A, the lowest habitable floor in the building, at 16.7% above the field band's Rs 40,000 base. The band's top of Rs 55,000-60,000 is attributed by the field, and corroborated by listing quotes computing to Rs 56,000-58,200, to 'higher floors with clearer views'. The two clearest arcs are the north and Wing B's east; 7 Mahalaxmi is sanctioned to 241.9 m and 312 m at 509 m due north, and the east mid-field is filling.
A deck-facing low floor already costs Rs 46,686 a foot here, so everything above that is paid for height and open sky - on the two arcs that have sanctioned towers standing in them.
Source: registered documents, REXRAY-FIELD, secondary sources, Rexray analysis
MEDIUM
The building was begun by a different developer, and nothing a buyer reads says so
MarketedThe brochure presents the project as a Prestige Group development throughout and never explains the word 'Jasdan'. 'Jasdan Construction' and 'Jasdan Altezza' appear nowhere in its 34 pages, and no predecessor developer, landowner or joint-venture counterparty is named anywhere.
DocumentedThe scheme was begun as 'JASDAN ALTEZZA' by JASDAN CONSTRUCTION PRIVATE LIMITED, to whom the commencement certificate of 06/11/2018 is addressed at Marathon Innova, Lower Parel. Prestige entered by Development Agreement on 01/10/2019, bought the land on 17/08/2021 for Rs 185 crore, and was accepted by MCGM as the substituted applicant on 20/10/2021 - FIVE DAYS AFTER MahaRERA had already registered the project in Prestige's name on 15/10/2021. The certificate keeps its original number and its original addressee on page 1 to this day; the substitution is proved only on page 5 of the same PDF.
A municipal change-of-applicant, not an insolvency substitution - and therefore invisible to Rexray's usual test.
Source: government filings, registered documents, marketing
MEDIUM
The MahaRERA record has denied a registered mortgage for three and a half years
MarketedThe MahaRERA record answers 'Do you have Financial Encumberance : No', and the promoter's own letters state that 'no Charge/ Security Interest has been created against the Project/ Property'.
DocumentedA Memorandum of Entry dated 18/10/2022, sr. BBE-03/19247 of 2022, creates a mortgage in favour of SBI TRUSTEECAP COMPANY LIMITED over the project. It is recited in the promoter's own title report and at Recital S of the registered agreement. A partial release of 25/08/2023 discharged 335.35 sq m of amenity space and 52 EWS tenements. Separately, the two files in the dump LABELLED 'CERSAI' are not CERSAI reports at all - they are Prestige letterhead letters promising to 'submit updated CERSAI reports... as and when the change is created'.
The charge position is professionally verified; the portal answer is simply wrong and has been since 2022.
Source: registered documents, government filings
MEDIUM
Sixty-six households the registration does not mention
MarketedThe brochure describes 'Two towers ensconced in a gated community', 'A private 2 acre oasis' and 'An exclusive clubhouse which will be patronised by your few neighbours'. It contains no reference to EWS, inclusive housing, affordable housing or any second housing category anywhere in 34 pages. Its hero render does show an unlabelled mid-rise block on the site.
DocumentedA separate ten-storey INCLUSIVE HOUSING WING of 66 tenements stands on the same plot, at the street end between the sale towers and N.M. Joshi Marg, 29.30 m tall. The Proforma A tenement statement counts 3 at stilt plus 7 on each of the 1st to 9th floors. 52 of the 66 were transferred to Brihanmumbai Municipal Corporation by registered Deed of Transfer of 27/12/2023, each 27.89 sq m carpet, with 7 car parking spaces and 'independent exclusive facilities/amenities'; the title report records that 'the balance 14 units/tenements will be retained by the PEPL'. The MahaRERA Building Details table lists TWO buildings. The compound holds four structures and 299 households.
The compound houses 299 households, not 233, and a fifth of them appear in no filing and no marketing document.
Source: government filings, registered documents, marketing
MEDIUM
Marketed as Mahalaxmi, approved and taxed as Byculla
Marketed'MAHALAXMI - MUMBAI' on the cover and the title spread. 'Two towers ensconced in a gated community as Mahalaxmi sparkles with life outside.' 'MAHALAXMI'. 'We're giving Mahalaxmi its new place of pride. And you, a new address to flaunt.' Back cover: '556, NM Joshi Marg, Off Jacob Circle, Mahalaxmi, Mumbai, Maharashtra - 400 011'.
DocumentedThe MahaRERA record, the commencement certificate, the occupation certificate, both title reports and the Property Register Card all place the property at Cadastral Survey No. 2020 of BYCULLA DIVISION, 556 N.M. Joshi Marg, Byculla, E Ward, PIN 400011. 'Byculla' appears three times in the brochure's 34 pages and never as the project's locality: as a rail-distance row, as a map label placed SOUTH of the project pin, and inside the six-point registration sentence on the back cover.
The word Byculla appears in this brochure only as somewhere else - a station, a neighbour on the map, and a line of legal small print.
Source: marketing, registered documents, government filings
MEDIUM
Three unquantified spaces attached to the home, and no red line to measure them against
Marketed'Sprawling Sundecks with sweeping views of the Mumbai skyline'; 'Entry Foyer in all residences offering privacy'; 'Maximum living space with minimal wastage'.
DocumentedThe agreement states ONE carpet figure (203.45 sq m) and ONE aggregate of 10.40 sq m 'comprising of balcony and deck/flower bed / dry balcony', numbered '(i)' with an empty space below it. The sanctioned plate shows the balcony alone at 6.94 x 1.50 = 10.41 sq m - i.e. the whole declared aggregate. The same plate also draws, attached to the same home, a DRY BALCONY of 3.65 x 1.35 (4.93 sq m), an ENCLOSED FOYER of 2.98 x 2.75 (8.20 sq m) inside the front door, and a 'SERVICE SLAB 60 cm below'. None is quantified anywhere in the agreement. And the red boundary line by which cll. 1.1.9, 4.1 and Recital T define the Flat is ABSENT from the registered copy, which is a greyscale scan with zero red pixels.
The instrument that sold the home cannot be reconciled with the drawing of it.
Source: registered documents, government filings
MEDIUM
Ten parking levels, and the developer decides which one is yours after you have paid
MarketedThe brochure makes NO parking claim of any kind - the words parking, bay, valet, car lift, podium, basement, garage, EV and charging appear nowhere in 34 pages. Its only vehicular reference is 'Outside is a driveway amidst manicured greens.'
DocumentedParking climbs ground plus SEVEN podium decks as built. The mechanism is good - a drivable ramped self-park with SEPARATE one-way up and down ramps 7.50 m wide at 1:10.62, 6.00 m driveways and individually numbered dedicated bays, with lifts and lobbies at each end of every deck; there is no car lift, stack or puzzle rack anywhere. But the bay is 'an exclusive amenity attached to the Flat', not a deeded asset; no consideration was charged for it; unallocated bays remain 'the absolute property of the Developer'; and cl. 4.2 defers the choice: 'the location of the Car Parking Space/s shall be identified and finalized by the Developer at the time of offering possession'. No EV charging provision exists in the specification or the agreement.
The access mechanism is at the top of the ladder; the allotment terms are at the bottom.
Source: registered documents, government filings
MEDIUM
The two cleanest arcs today are the two with sanctioned towers coming
Marketed'Two towers ensconced in a gated community'; 'A sweep of endless views'; 'When you're here, the outside world shall not intrude.'
Documented[REXRAY-FIELD] 'north is cleanest today with greenery but Mahalaxmi 7 (Runwal) will block in future.' 7 Mahalaxmi stands 509 m due north at bearing 11 degrees; its Tower 3 is sanctioned to 241.9 m on the Section sheet in its own Rexray leaf, and its Plot B pair at 312 m already registers on Wing B's north-east arc at 276 and 349 m, walling at every floor when built. On the west, L&T Mahalaxmi at 300 m and the Piramal Gr+78 parcel at 242 m sit on the same bearings as the sea aspect.
North is the best arc in the building and a 242 m tower is sanctioned 509 m up it; west is the only sea aspect and a 300 m tower is sanctioned across it.
Source: REXRAY-FIELD, government filings, Rexray analysis
MEDIUM
Four high-speed elevators, two of which are a fire lift and an evacuation lift
Marketed'4 High-Speed Elevators with just 2 to 4 residences on a floor' (brochure p.19).
DocumentedEach core draws four lift shafts and two of them are a fire lift and an evacuation lift. Ordinary passenger service is TWO lifts per tower over 44 landings and a 172.90 m rise. Modelled on those two the peak interval is 62-80 seconds at luxury lift speeds and 80-103 seconds at ordinary ones - the bottom grade on both. On three cars, counting the fire lift, it is 41-53 seconds; on four, 31-40 seconds. The marketed figure is reachable only by counting the evacuation lift as everyday transport. Wing A puts 75 homes on its two passenger lifts and Wing B puts 153 on the same two.
Everyday lift service is two cars for 45 floors, and the second tower carries twice the population per car that the first does.
Source: government filings, marketing, Rexray analysis
LOW-MED
The mill parcel on the southern boundary is the one un-analysed redevelopment candidate
Marketed'sweeping views of the city'; 'A private 2 acre oasis'; the location map draws the entire block around the project pin as blank white space.
DocumentedThe registered boundaries are: East N.M. Joshi Marg, West the property of Lakhmidas Gokuldas Dossa and others, SOUTH THE PROPERTY OF SIMPLEX MILLS LTD, North the property of MCGM and Mohamedbhoy Rowjee. The block plan's own setback dimensions put both towers 9.03 to 10.68 m from the northern and southern boundaries - and because each tower's plate runs north-south, the NORTH AND SOUTH FACES ARE WHERE THE BALCONIES AND LIVING ROOMS ARE. No height is sourced for any of the three abutters.
The registered abutters do not wall the aspects today; the southern parcel is a mill site and mill sites in this belt redevelop.
Source: registered documents, government filings
LOW-MED
No rainwater harvesting, no EV charging, no named brand in the specification
Marketed'Lofty Floor to Ceiling Experience with ~11 ft height*'; 'Air Conditioned residences*'; 'Luxury finishes with Marble flooring'; 'imported marble'. Both asterisks on that page have no footnote anywhere in the document.
DocumentedThe architect's own Table B for the registered phase records 'Water conservation / Rain water harvesting' as NIL. Annexure J's fifteen-line specification contains no rainwater harvesting, no solar, no sewage treatment plant and no water-treatment item, and NO MANUFACTURER IS NAMED for any lift, fitting, sanitaryware, glazing, HVAC or home-automation system - the marble is 'imported' with no origin or grade, and the lifts are 'of suitable size and capacity'. There is no EV charging provision anywhere in the agreement or the specification.
A specification pitched at the top of the market that names not one brand, and a 2025 building with no charging and no rainwater harvesting.
Source: registered documents, government filings
LOW
The leaf's geometry is measured off a superseded drawing - two parking decks bigger than the building
MarketedNone - no marketing document mentions approvals.
DocumentedThe occupation certificate is granted 'as per the approved amended plans dated 12.03.2025'. Those plans and their approval letter are in NEITHER the MahaRERA dump NOR the registered agreement's annexures; the latest amended-plan approval anywhere in the file is 05/12/2023. The plan set this leaf is read from - the 28-sheet 2022 upload - draws 'GROUND FLOOR + 1st TO 9th PODIUM, BLDG.HT. = 32.60 MT' with a 17.15 m clubhouse. The occupation certificate and the architect's own Form 1 both record SEVEN podium decks and an 8.40 m clubhouse. Neither plan set in the file carries a legible date in its 'STAMP OF DATE OF APPROVAL OF PLAN' box, so the standard check - that the governing certificate cites the plan date you selected - cannot be run at all.
The entitlement question is closed by the occupation certificate; what survives is a measurement caveat.
Source: government filings
LOW
The promoter's own certificate said the estate was two-thirds finished; the ground says it is finished
MarketedThe brochure promises a twelve-item 'Lifestyle Hallmark' - infinity edge pool, fully equipped gym, luxury spa, squash court, badminton court, community hall with banquet, kids play area, pet park, senior citizen enclave, yoga and meditation deck, poolside cafe and 'Miyawaki Greens' - and a clubhouse that is 'Elevated, exclusive and quite extraordinary'.
DocumentedSeven months AFTER the occupation certificate, the engineer's Form 2 certifies the BUILDING at 99.20% (Rs 408.13 cr incurred of Rs 411.42 cr estimated) but the INTERNAL AND EXTERNAL DEVELOPMENT WORKS OF THE LAYOUT at 69.10% (Rs 141.81 cr of Rs 205.28 cr), leaving Rs 63,46,79,270 still to be spent. The architect's Form 1 of the same date carries Wing B's internal walls, plaster, flooring, doors and windows at 90% and its 'Staircases, Lifts Wells and Lobbies at each Floor level' at 85%; Wing A reads 95% and 90%. Table B of the same certificate records 'Water conservation / Rain water harvesting' as NIL.
Rs 63.47 crore of layout works showed as unspent seven months after occupation, and eight months later the estate is built and occupied.
Source: registered documents
LOW
A sanctioned drawing screens the parking decks from a prison the marketing never mentions
MarketedThe brochure's location map labels hospitals, schools, malls, clubs, cinemas and the racecourse. It does not label a prison.
DocumentedThe sanctioned podium plates carry the printed instruction 'LOUVERS TO AVOID DIRECT VISION TOWARDS JAIL', repeated on the sheet. Rexray places Arthur Road Jail (Mumbai Central Prison) within a few hundred metres and has met it on two previous subjects in this belt: at P24 Piramal Mahalaxmi an No-Objection Certificate was required, and at P34 7 Mahalaxmi the sale towers were oriented deliberately to avoid overlooking it.
The approving authority required louvers toward the jail on the car-park levels; the field's view is that no prisons No-Objection Certificate was required.
Source: government filings, marketing