Earth Enclave

A near-topped-out Girgaon tower whose view, top-floor sanction and recorded price are the open questions. · RERA P51900046831

p84 / P51900046831 / draft 2026-09-16

Overall Score5.4/10as of

Earth Enclave is the better-built end of a Girgaon cessed tower - freehold in the developer's own name, real ramped parking, a top-tier structural engineer - but what a buyer verifies here is not the building, it is the distance between what is marketed, priced and sanctioned and what is actually on the record.

Flags none

INVESTIGATE - a mid-build Girgaon cessed tower whose priced aspect is contradicted by the massing, whose finishes are stalled with the budget spent, and whose top-floor sanction and registered price are both still to be produced.

The five things that decide it
1The project is marketed on an 'uninterrupted sea view'. The sea is to the west, and two same-height neighbours - Mitani Sky9 (125 m) and the Nakoda Mehta Sunshine towers (127 m), 150 to 200 metres off - obstruct part of that western arc at every floor, since matching this tower's height means going higher does not clear them. The sea view is real but partial, not uninterrupted.
2The structure is nearly there - Wing A slabs at 86 per cent, the rehab wing complete - but the finish is not: internal and external works stand at 30 per cent while the engineer has already certified 113 per cent of the construction-cost estimate as spent, and the last commencement certificate lapsed in November 2025 against a promised end-2027 handover.
3No aspect here is durable: every neighbour that takes part of a view, or could, is itself a live cessed redevelopment on the same entitlement this tower used - and the one fully open living face, the east three-bedroom, looks inland rather than at the sea.
4The one registered price in hand stamps a twentieth-floor flat near the government ready reckoner and far below the Girgaon field rate - the shape of a large cash component, still to be confirmed on the actual consideration.
5The fundamentals under it are ordinary-to-decent: freehold in the developer's own name, real ramped self-park, well-ventilated kitchens, a workable lift bank, and a top-tier structural engineer - all held behind a missing governing sanction for the top six floors.
FVL — Rexray's index · F Fundamentals · V Value · L Livability · each pillar is the average of its scored attributes, scored 0–10: Weak (<4) · Mixed (4–6) · Fair (6–7.5) · Strong (7.5+) · the verdict is set separately, by hard-stop rules · Scoring Methodology →

Fundamentals

5.4/10Mixed

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

Clear Title6.0/10
Clean freehold, thin paper, a live charge
  • The land is freehold in the developer's own name.
  • The Trust that owned the old R.K.
  • Wadi land conveyed it to the promoter and the Property Register Card was mutated to match, so there is no split between a landowner and a developer, no lease running down, and no renewal premium for a future society to find - cleaner than most Girgaon redevelopments in the Altamount-Cumballa set.
  • What holds it back is the paper and a charge.
  • The only title instrument is a 2021 short-form certificate with a flow-of-title annexure and no search brought up to date; the cessed scheme's MHADA clearance and a proper charge search are not in the record; and Aditya Birla Capital holds a 110-crore charge on the project's receivables, about 97 crore of it outstanding, against two 2022 declarations that say the project is unencumbered.
Understand “Clear Title” on the X-Ray page ↗
Delivery5.5/10
Topped out in structure, stalled in finish
  • The sale wing's frame is most of the way up - slabs at 86 per cent as at mid-2026 - but its finishes stand at 30 per cent and the stilt floor at zero, while the engineer certifies that 113 per cent of the estimated construction cost has already been incurred and the internal and external development works at nothing at all.
  • The money is spent and the finish is barely begun.
  • The last commencement certificate lapsed in November 2025 with no renewal on file, and possession is promised for the end of 2027.
  • The rehab wing is structurally complete.
  • The developer has no other delivered project to read a track record from here.
Understand “Delivery” on the X-Ray page ↗
Developer Compliance5.0/10
A public record that has to be rebuilt from private paper
  • The portal now shows the 110-crore charge and does declare the 155 rehab homes, but it mis-states the parking as 332 open-space bays a plot this size cannot hold, over-states permissible built-up area, lists a two-wing project as one building, leaves the commencement-certificate table blank, and carries a sold-unsold disclosure three years older than its own construction filings.
  • The governing 2024 sanction is missing and a form mis-types the registration number.
  • None of it is fatal alone; together it means the public file cannot be relied on until it is rebuilt from the documents.
Understand “Developer Compliance” on the X-Ray page ↗
Brochure-vs-Reality5.0/10
Sold on the one thing the record contradicts
  • The project's headline claim is an 'uninterrupted sea view'.
  • The sea is to the west and the massing shows two same-height neighbours, a couple of hundred metres off, obstructing part of that arc at every floor, so the defining claim - uninterrupted - is the one the record does not support.
  • Around it the marketing shows an old registration number, a superseded floor count, and lift and podium figures the drawings do not bear out, while the carpet-area and configuration claims are broadly right and a green-building certificate is claimed but unverified.
  • Loose on the fact that prices the building, honest on the smaller ones.
Understand “Brochure-vs-Reality” on the X-Ray page ↗

Value

5.2/10Mixed

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

View4.5/10
The sea view is partial; the fully open face is inland
  • The sea-facing west living rooms - two of the five homes on a floor - look towards Mitani Sky9 at 125 metres and the Nakoda Mehta Sunshine towers at 127, all the same height as this building and 150 to 200 metres off.
  • A same-height tower obstructs the slice of the arc it occupies at every floor, so going higher does not clear it - but these towers cover only part of a wide western arc, so the sea view is partial rather than gone.
  • The two south homes over the wider frontage road keep a moderate outlook past one distant tower; the single east three-bedroom is the one fully open living face but it looks inland, not at the sea; and the north is bedrooms only, obstructed to about the twenty-fourth floor by the scheme's own rehab wing.
  • Every obstructor is a live cessed redevelopment on the same entitlement this tower used, so no aspect here should be priced as permanent.
Earth Enclave — the plot and what surrounds it
Rexray View Map: Earth Enclave and its surrounding development
Understand “View” on the X-Ray page ↗
Layout & Living5.5/10
A deliberate cross-plate, an efficiency the core pays for
  • Five apartments to a floor around a central core - one three-bedroom and four two-bedroom, 401 square metres of carpet - on a plus-shaped plate whose form is deliberate: it gives every home external walls and cross-ventilation rather than being an irregularity forced by the site.
  • Efficiency lands around sixty-seven per cent, held down by a core that is heavy for so small a plate, three passenger lifts plus a fire and a stretcher lift and a staircase.
  • No butterfly circulation, no columns in the living space, kitchens on the outer wall.
  • Approximate until the plate outline is measured.
What to ask the builder
  • The west-face glass specification — brand, glazing thickness, and the heat-trapping (SHGC / U-value) number.
Understand “Layout & Living” on the X-Ray page ↗
Non-RERA Area7.0/10
No hidden common-area grant found
  • No restricted-common-area grant is established.
  • The registered plate draws chajjas and service slabs rather than decks, and the exclusive-area clauses could not be read because the agreement is an image scan, so the question of whether any lobby or common area is granted exclusive to a home is open rather than adverse.
  • Scored at the no-finding level and carried as a buyer question, not a deduction.
Understand “Non-RERA Area” on the X-Ray page ↗
Pricing4.0/10
Stamped near the reckoner - the shape of cash
  • The one figure in hand is a stamp valuation: a twentieth-floor flat stamped at about 2.14 crore, which works out near the government's own ready-reckoner rate and far below the sixty-thousand-a-foot field band for high-floor Girgaon stock, with the neighbouring tower's registered thirty-two thousand as the local comparable.
  • A registered price near the statutory floor rather than the market is the signature of a large cash component - but the actual consideration was not cleanly readable from the scanned agreement, so the reading is held soft until it is confirmed.
What to ask the builder
  • What is the all-in cost — including stamp duty, registration and goods-and-services tax (GST)?
  • What is the rate on the area I actually own (carpet plus deck) versus the marketed area?
  • What have recent apartments in this building / micro-market actually registered at?
Understand “Pricing” on the X-Ray page ↗

Livability

5.7/10Mixed

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

Compound Density4.0/10
Sixty-five per cent rehab, in a separate wing
  • Two wings and a parking podium on a small central plot, with the rehab wing holding 155 of the 238 homes - the original cessed-building society rehoused, a middle-class re-accommodation rather than a slum rehabilitation.
  • The mitigation is structural: sale and rehab occupy separate wings rather than one building, so the same-building penalty does not fire, though the lower sale floors interleave some rehab.
  • What is left is plain density on a small plot.
Understand “Compound Density” on the X-Ray page ↗
Neighbourhood4.0/10
A block mid-redevelopment, all one direction
  • Girgaon in five years will be denser and taller, and it is happening on this block now: three neighbours, two of them the height of this tower and one taller, are live cessed redevelopments within a few hundred metres, each on the same entitlement.
  • The lanes are narrow and formally sub-standard, and the fabric around is chawl-scale cess stock mid-wave.
  • The plot carries no reservation, which removes the municipal-facility exposure, but the direction is one way - more towers, more traffic.
Understand “Neighbourhood” on the X-Ray page ↗
Peak-Hour Connectivity4.0/10
Fifteen minutes to the coast, by the grid
  • About fifteen minutes to the nearest coastal-road ramp on a weekday - the Girgaon condition, where the sea is near in metres and far in minutes because the approach is the dense grid, not the distance.
  • The plot fronts an eighteen-metre road with two nine-metre lanes to its sides, and the district is absorbing the construction traffic of three towers going up within a few hundred metres before it carries their residents.
Fixable? Builders like to sell connectivity as kilometres from a landmark — but the real test is time, not distance: how long you would actually be stuck, at peak hour, just getting to a fast arterial like a Sea Link or Coastal Road on-ramp. The access route and the on-ramp are municipal and outside the developer's control, so there is no fix to offer — only an honest read of the peak-hour reality today and the area's trajectory by 2032, once the surrounding pipeline has built out.
Understand “Peak-Hour Connectivity” on the X-Ray page ↗
Kitchen Ventilation9.0/10
Every kitchen breathes
  • All five kitchens on the registered plate sit on the outer wall of the cross-form plate with a chajja, none interior or dependent on a duct.
  • The plus geometry that costs the layout efficiency is what buys the ventilation - a confirmed external air path for every kitchen.
  • A pass, to be re-confirmed against a lower rehab-interleaved floor.
Understand “Kitchen Ventilation” on the X-Ray page ↗
Lift Wait7.5/10
A conservative B on the lifts
  • The core carries three passenger cars plus a fire lift and a stretcher lift, serving about thirty-four habitable floors at five homes each; lift speed is not stated so four metres a second was assumed.
  • On three cars the wait is a borderline B-to-C at forty-four to forty-seven seconds; on four, counting the fire lift as the everyday car it usually is, a clean B at thirty-three to thirty-five.
  • Sealed conservatively at B - and the marketing's claim of seven lifts, if real, only improves it.
Understand “Lift Wait” on the X-Ray page ↗
Water Adequacy6.0/10
Water clearance not yet read
  • The hydraulic-engineer remarks and the water and sewerage conditions that would fix a per-head allocation were not readable from the scanned approvals, and the common-works table shows water supply and sewerage around a fifth complete.
  • No shortfall is established either way; held at the neutral band pending the sanctioned water clearance.
Understand “Water Adequacy” on the X-Ray page ↗
Parking6.5/10
Real ramped self-park, deferred allotment
  • A 6.8-metre two-way ramp and a second 4.5-metre ramp feed a six-level self-park podium, with no car lift, stacker or puzzle rack anywhere on the sheet - a genuine drivable system.
  • The portal's 333 bays give a ratio around one-and-a-half a home but are mis-typed as open space, which is void, so the count is indicative.
  • Six decks is a shorter climb than most towers of this kind.
  • The open question is contractual: allotment is deferred and none is yet allotted.
Understand “Parking” on the X-Ray page ↗
Build Planning & Qualitynot yet scored
A checklist to verify with the builder — Rexray will score this attribute as the field database grows.

Rexray's database will, over time, be enriched with the attention to detail and quality ethos of each builder. For now, below is the checklist you should verify with the builder before you decide.

What to ask the builder
  • Who's the architect, and what comparable have they delivered?
  • Do the lobbies need lights during the day?
  • Gym/pool/lobby sized for how many residents? (gym sqft / residents)
  • Does this unit's layout meet your Vastu requirements (entry, kitchen, master)?
  • Can a fire tender or an ambulance reach the lobby?
  • Who is actually building it?
  • Mivan or conventional — and how are the tie-holes grouted and cracks controlled?
  • What's the realistic floor-cycle, and how does the monsoon factor in?
  • Which steel/cement? Facade glazing spec? MEP contractor? STP/solar?
  • Which marble/fittings exactly? Which window system? VRV brand?
  • Deck/bathroom waterproofing system? How's the facade sealed into the structure?
  • Gypsum or block internal walls — and are the party walls insulated?
  • Does the back-up generator power my whole flat, or only the common areas?
  • Is the parking solo, tandem, or a mechanical stack — and how wide are the bays?
Understand “Build Planning & Quality” on the X-Ray page ↗
Community4.5/10
Two constituencies, one compound
  • The compound mixes 155 rehoused cessed-society households in one wing with 83 sale homes in the other, sharing a common ground floor, basement and podium.
  • The sale side is a mid-luxury Girgaon profile of two- and three-bedroom homes rather than an ultra-luxury one.
  • Society formation and the buyer profile have not been fed, so this is a draft placing rather than a measured one.
What to ask the builder
  • What is the ticket-size range in the building — the gap between the cheapest and the most expensive home?
  • Is the building vegetarian-only, or skewed to a single community?
  • Is it owner-occupied, or investor- and tenant-heavy?
  • What is the pet policy?
Understand “Community” on the X-Ray page ↗

Findings register

7 findings · severity-ranked

Every marketed claim set against the documented fact, sourced. Critical and high first.

HIGH
Marketed 'uninterrupted sea view' is obstructed in part at every floor
Marketed'A Landmark with Uninterrupted Sea View' (project headline).
DocumentedThe sea aspect is the west face; Cesium massing puts Mitani Sky9 (125 m, 152 m away) and Nakoda Mehta Sunshine (127 m, 177-195 m) directly on it, both the subject's own height, so they obstruct part of the western arc at every habitable floor (a diminished, not eliminated, sea view).
The one aspect the project is sold on is the one the neighbours partly obstruct.
HIGH
Finishes stalled at 30% with the construction budget spent and the Commencement Certificate lapsed
DocumentedForm 1 (30/06/2026): Wing A slabs 85.71%, stilt 0%, all finishes 30%. Form 2 (13/07/2026): cost incurred Rs 158.5 cr = 113% of the Rs 140 cr estimate, Table B works at 0%. Last Commencement Certificate endorsement lapsed 03/11/2025. Possession promised 31/12/2027.
The money is spent and the finishes are barely begun, 15 months from the committed date.
MEDIUM
No aspect is durable - every obstructor is a live cessed redevelopment
DocumentedMitani Sky9, Nakoda Mehta Sunshine and Shreepati Jewels are all under construction within ~300 m on the same 33(7) entitlement this tower used; the open east aspect faces inland, not the sea.
The open faces are open only because the neighbours have not topped out yet.
MEDIUM
Registered price near the ready reckoner - a probable large cash component
DocumentedIndex-II stamp value for the 20th-floor flat ~Rs 2.14 cr (~Rs 26,000/sqft carpet on the stamp basis) sits near the ready reckoner and far below the Girgaon field band (Rs 60,000+); 232 Dhuleva 0.4 km away showed the same shape. Actual consideration not yet read.
The stamp value points to a big off-instrument component; confirm on the consideration.
MEDIUM
Governing 28/03/2024 sanction (floors 37-42) absent from the record
DocumentedThe governing Commencement Certificate endorsements are granted against amended plans dated 28/03/2024; neither the letter nor the sheets are in the dump. The only plan sheet is the superseded 18/05/2022 sanction, which stops at the 36th floor.
The top sale floors' geometry rests on plans nobody has produced.
MEDIUM
Rs 110 cr NBFC charge on receivables; no MHADA No-Objection Certificate and no CERSAI search
DocumentedAditya Birla Capital Rs 110 cr sanctioned on project receivables, ~Rs 96.69 cr outstanding, contradicting two 2022 nil-encumbrance declarations. The cessed-scheme MHADA/Repair-Board No-Objection Certificate and a CERSAI search report are not in the record.
The finance is ordinary but the charge-free-delivery and cess-No-Objection Certificate questions are open.
LOW-MED
65% rehab on a small plot, mitigated by the separate-tower configuration
Documented155 of 238 units are cessed-society rehab in a separate wing (Wing B); sale is Wing A. Middle-class re-accommodation tier, not SRA.
High rehab share, but rehab and sale are in different wings.
Five questions to ask before you commit
  1. Why is the project sold on an 'uninterrupted sea view' when two same-height towers a couple of hundred metres off obstruct part of the western arc at every floor?
  2. What is the site status now against the June-2026 finishes at 30 per cent, and has the commencement certificate been renewed since it lapsed?
  3. What is the actual registered consideration, and what is the cash expectation on top of it?
  4. Will the specific flat be delivered free of the 110-crore charge on the project's receivables?
  5. Where are the 28 March 2024 sanctioned plans for the top six floors, and the MHADA rehab No-Objection Certificate?
Rexray — Real Estate X-Ray. This is a research view built from registered documents, government filings, and Rexray field analysis; it is not legal, financial, or investment advice. Verify every figure against the source documents before you transact.