Detailed Report · as of 2026-09-17

Avisa by S Raheja

Perry Cross Road, Bandra West — six luxury homes over a rehoused society. · RERA P51800047928 (Lapsed)

Perry Cross Road, Bandra West — freehold society (33(7)(B)) redevelopment, delivered/OC'd

Overall Score7.2/10as of 2026-09-17

A freehold, delivered, clean-title Perry Cross Road boutique — where the sea view is real today but not promised forever, and every car rides a lift to its bay.

Flags none

The five things that decide it
1Freehold land, already conveyed to the society, clear and marketable with no encumbrances — rare for a Mumbai redevelopment.
2Delivered with its occupation certificate — a finished building you can inspect, not an off-plan promise.
3The Arabian Sea view is real from the upper floors today but NOT lifetime-protected — the low-rise lane in front is redeveloping.
4Parking is car-lift-only with no ramp — retrieval time and SUV clearance are the daily trade-off at a ~Rs.39 Cr ticket.
5A marquee Perry Cross Road address, Bandra West — shares the neighbourhood with Sachin Tendulkar's home, a stone's throw from Joggers Park.
FVL — Rexray's index · F Fundamentals · V Value · L Livability · each pillar is the average of its scored attributes, scored 0–10: Weak (<4) · Mixed (4–6) · Fair (6–7.5) · Strong (7.5+) · the verdict is set separately, by hard-stop rules · Scoring Methodology →

Fundamentals

7.5/10Strong

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

Clear Title8.5/10
Freehold and already conveyed — a genuinely clean title
  • The society owns its land outright as freehold, conveyed to it back in 1967, with the old construction mortgage cleared in 2008.
  • A 55-year search found it clear and marketable with nothing owed against it.
  • That is rare for a Mumbai redevelopment, where most plots are leasehold or still awaiting conveyance.
  • The only gaps are the advocate's own — no court search and no separate charge search — worth closing but not alarming.
Understand “Clear Title” on the X-Ray page ↗
Delivery8.5/10
Built and OC-received — a finished building, not a promise

The occupation certificate is in hand, so this is a completed building you can walk through rather than an off-plan bet. The lapsed RERA registration is simply what happens after a project finishes.

The folder is missing the final amended plan and later commencement certificate, but the OC makes that a paperwork gap, not a delivery risk — an OC cannot issue against an unsanctioned building.

Understand “Delivery” on the X-Ray page ↗
Developer Compliance6.5/10
Light compliance, but the portal was left lapsed
  • As a single-building society redevelopment the RERA burden is light.
  • The registration has lapsed — normal once a building is complete — but the developer never updated the portal to show the OC, so the public record understates the project's true, finished state.
Understand “Developer Compliance” on the X-Ray page ↗
Brochure-vs-Reality6.5/10
Mostly straight, but the sea view is oversold as permanent
  • Most of the marketing holds up: the OC is real, the separate car-park tower exists, the home mix is accurate.
  • The stretch is the 'panoramic Arabian Sea' pitch — true from the upper floors today, but sold as if it were guaranteed when the low-rise lane in front is actively redeveloping.
Understand “Brochure-vs-Reality” on the X-Ray page ↗

Value

6.8/10Fair

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

View5.5/10
Real sea view from the upper floors today — not a lifetime one

The buildings between Avisa and the sea are only five to six storeys, so the upper floors genuinely see the water right now. The lower floors look into that neighbouring low-rise instead.

  • But the view is borrowed, not owned: this lane is redeveloping — the corner building already has, and Avisa is the second — and the Joggers Park side opposite could rise too.
  • Price the view as a current asset that a future tower could close, not a permanent one.
Avisa by S Raheja — the plot and what surrounds it
Rexray View Map: Avisa by S Raheja and its surrounding development
Understand “View” on the X-Ray page ↗
Layout & Living7.0/10
Efficient boutique layouts with decks on every home
  • Two homes share each lower floor around a central lift core, opening out to larger amalgamated homes higher up, and every flat has a deck.
  • The plate is a touch irregular on the irregular plot but efficient for the segment.
What to ask the builder
  • The west-face glass specification — brand, glazing thickness, and the heat-trapping (SHGC / U-value) number.
Understand “Layout & Living” on the X-Ray page ↗
Non-RERA Area8.5/10
Nothing you pay for that you don't own
  • The covered sit-outs are disclosed and counted in the carpet you buy, and with one home per upper floor the lift lobby is an unbilled bonus rather than a carved-out 'exclusive' area.
  • No restricted-common-area concern here.
Understand “Non-RERA Area” on the X-Ray page ↗
Pricing6.0/10
Fair for the frontage — middle of the band, not a bargain

The registered rate of about Rs.91,000 a square foot on carpet sits in the lower-middle of the roughly Rs.85,000–1.25 lakh range this stretch of Perry Cross Road commands.

That is the right place for a good-but-not-lifetime view — the truly protected-view addresses nearby fetch closer to Rs.1.5 lakh. Worth a direct question on any cash component at this ticket size.

What to ask the builder
  • What is the all-in cost — including stamp duty, registration and goods-and-services tax (GST)?
  • What is the rate on the area I actually own (carpet plus deck) versus the marketed area?
  • What have recent apartments in this building / micro-market actually registered at?
Understand “Pricing” on the X-Ray page ↗

Livability

6.8/10Fair

Pillar score is the average of the scored attributes below; some attributes are qualitative and carry questions rather than a number.

Compound Density7.5/10
Low-density boutique — about 23 homes, all affluent
  • No commercial, hotel or slum component — just a small building of around 23 homes.
  • The 17 original society members are rehoused in the same tower, but they are affluent Bandra owner-occupiers, so sharing the building with them is a light note rather than a real density or mix concern.
Understand “Compound Density” on the X-Ray page ↗
Neighbourhood6.5/10
A marquee Perry Cross Road address, mid-redevelopment

This is prestige Bandra West — Perry Cross Road, the same neighbourhood as Sachin Tendulkar's home and a stone's throw from Joggers Park.

The tempering factor is churn: several plots in the immediate lane are redeveloping, so expect construction around you and a streetscape still in motion.

Understand “Neighbourhood” on the X-Ray page ↗
Peak-Hour Connectivity5.5/10
Poor coastal access today, transformed within a year or two
  • Reaching the Sea Link today means roughly twenty minutes through congested Bandra.
  • A new coastal-road entry near Otter's Club is expected within a year or two, which would cut that to a couple of minutes — a real near-term upside, the same one the neighbouring Supreme Arthouse enjoys.
Fixable? Builders like to sell connectivity as kilometres from a landmark — but the real test is time, not distance: how long you would actually be stuck, at peak hour, just getting to a fast arterial like a Sea Link or Coastal Road on-ramp. The access route and the on-ramp are municipal and outside the developer's control, so there is no fix to offer — only an honest read of the peak-hour reality today and the area's trajectory by 2032, once the surrounding pipeline has built out.
Understand “Peak-Hour Connectivity” on the X-Ray page ↗
Kitchen Ventilation9.0/10
Kitchens breathe — window onto a dry yard

Both kitchens open onto an external dry yard with a weather-shade over the opening, i.e. a proper openable window and fresh-air path — no sealed, recirculation-only cooking here.

Understand “Kitchen Ventilation” on the X-Ray page ↗
Lift Wait8.0/10
Three lifts, a short wait

Two passenger lifts plus a fire-evacuation/service lift serve a building with very few households, so lift-waits are comfortably short for a tower of this height.

Understand “Lift Wait” on the X-Ray page ↗
Water Adequacy7.0/10
Water secured — the OC clears it
  • Municipal rules required the water-supply No-Objection Certificate before occupation, and the OC is in hand, so the sanctioned homes have their water connection.
  • Standard adequacy for a small building.
Understand “Water Adequacy” on the X-Ray page ↗
Parking4.0/10
Car-lift to every bay — but two lifts and few homes keep the wait light

Parking sits in a separate tower reached only by two car-lifts that carry cars up to seven podium decks. There is no ramp, so you cannot drive to your own space — the lift is the only way up and down.

  • What saves it is redundancy and scale: two independent lifts mean no single-point jam, and with only around two dozen homes the queue stays short.
  • Still, test peak retrieval time, SUV clearance and which deck you are given before you buy.
Understand “Parking” on the X-Ray page ↗
Build Planning & Qualitynot yet scored
A checklist to verify with the builder — Rexray will score this attribute as the field database grows.

Rexray's database will, over time, be enriched with the attention to detail and quality ethos of each builder. For now, below is the checklist you should verify with the builder before you decide.

What to ask the builder
  • Who's the architect, and what comparable have they delivered?
  • Do the lobbies need lights during the day?
  • Gym/pool/lobby sized for how many residents? (gym sqft / residents)
  • Does this unit's layout meet your Vastu requirements (entry, kitchen, master)?
  • Can a fire tender or an ambulance reach the lobby?
  • Who is actually building it?
  • Mivan or conventional — and how are the tie-holes grouted and cracks controlled?
  • What's the realistic floor-cycle, and how does the monsoon factor in?
  • Which steel/cement? Facade glazing spec? MEP contractor? STP/solar?
  • Which marble/fittings exactly? Which window system? VRV brand?
  • Deck/bathroom waterproofing system? How's the facade sealed into the structure?
  • Gypsum or block internal walls — and are the party walls insulated?
  • Does the back-up generator power my whole flat, or only the common areas?
  • Is the parking solo, tandem, or a mechanical stack — and how wide are the bays?
Understand “Build Planning & Quality” on the X-Ray page ↗
Community6.5/10
A homogeneous, high-end community
  • The residents are the 17 affluent original members and buyers of Rs.39-crore-plus homes — a consistent, high-strata Perry Cross Road profile.
  • Sharing the building with the original members is a light, not jarring, note.
What to ask the builder
  • What is the ticket-size range in the building — the gap between the cheapest and the most expensive home?
  • Is the building vegetarian-only, or skewed to a single community?
  • Is it owner-occupied, or investor- and tenant-heavy?
  • What is the pet policy?
Understand “Community” on the X-Ray page ↗

Findings register

11 findings · severity-ranked

Every marketed claim set against the documented fact, sourced. Critical and high first.

MEDIUM
Marketed 'Arabian Sea view' from an inland Perry Cross Road plot ~1.2 km from the sea
MarketedPanoramic views of the Arabian Sea
DocumentedWestern near-field is 5–6 storeys today so the sea aspect is real from upper floors, BUT it is not lifetime-protected: the lane is actively redeveloping (corner 'Sea Shell' already redeveloped; Avisa is the 2nd; opposite side faces Joggers Park).
The sea view is genuine from the upper floors today but carries a real redevelopment threat — price and pitch it as a current asset, not a lifetime one.
Source: marketing
MEDIUM
Car-lift-dependent mechanized parking in a separate tower (tier E) at Rs.39 Cr
DocumentedParking is a separate podium tower reached only by 2 car lifts (no drivable ramp to the bay); ~40 bays across 7 decks, mechanized.
You cannot drive to your bay — cars go up by car lift to a podium deck; retrieval time and SUV clearance are the live questions at this price.
Source: registered documents, government filings
LOW-MED
Same-building rehab + sale: 17 society members rehoused alongside the sale flats (C02)
DocumentedThe New Building rehouses the 17 existing Lalit Prakash members (small RERA-carpet flats on lower floors) in the SAME residential tower as the ~6 large free-sale flats (upper floors).
Buyers share one building and society with the 17 rehoused original members — an affluent Bandra freehold co-op, so a light cohabitation note rather than a strata mismatch.
Source: registered documents
LOW-MED
Open-space & parking deficiency conceded + advance no-objection to neighbours' deficient development (C19)
Documentedthe building approval requires the sale agreement to record that the building is constructed with open-space/parking-space deficiency AND that the buyer/society will not object to future neighbouring development with deficient open spaces.
The buyer pre-waives the right to object to a neighbour later building tight against the plot — the classic dense-plot clause that converts a future light/air/view risk into an unchallengeable one.
Source: government filings, registered documents
LOW-MED
the agreement retains all future/additional floor area (FSI) for the promoter + 10% forfeiture on default (C08/C09)
DocumentedThe promoter may utilise all additional/future floor area (FSI) (including set-back-area floor area (FSI)) up to the Full OC by adding floors/flats or extending flats, with the buyer waiving objection; on 3 defaults the promoter may terminate with liquidated damages of 10% of the Sale Price.
Standard builder-tilted terms — advance consent to the developer adding to the building, and a 10% forfeiture — neither extreme for the segment but both worth flagging.
Source: registered documents
LOW
MahaRERA registration lapsed — the normal post-OC state (OC received)
MarketedStatus: OC Received
DocumentedOC received (field-confirmed). The MahaRERA registration is lapsed, which is normal after a project is completed and occupied; the portal was simply not updated to reflect the OC.
Resolved: OC is received. A lapsed MahaRERA registration is normal after OC — not a live compliance risk; only the portal was left un-updated.
Source: registered documents, marketing
LOW
Governing sanctioned plan / section appears superseded; latest Commencement Certificate & OC not in folder
DocumentedThe folder's section (13-01-2022) draws a 13-floor residential tower; the as-sold configuration reaches the 19th floor and RERA records 29 total sanctioned levels. The amended sanctioned plan/section and the Commencement Certificate endorsement covering the built height are not in the folder.
Resolved: OC is received, so the as-built ~18–19-floor scheme is by definition sanctioned. The 13-floor folder section is simply superseded — a documentation gap, not a floors/delivery risk.
Source: registered documents, government filings
LOW
Commencement Certificate lapsed at stilt/podium extent while construction reached full super-structure
DocumentedThe only Commencement Certificate in the folder is endorsed to stilt/1st-podium and lapsed 22-09-2023; Form-1 (03-2025) certifies the super-structure at 100%.
Resolved: Commencement Certificate precedes OC; with OC received the lapsed podium-extent Commencement Certificate is moot (the OC supersedes the entire Commencement Certificate chain).
Source: government filings, registered documents
LOW
Developer is C.A. to Owner; land vests in the Society, conveyance to the new owners' body outstanding
DocumentedLand vests in Lalit Prakash CHS (freehold); the developer holds development rights via a registered DA + POA, not ownership.
Normal society-redevelopment structure — freehold and clean — but the conveyance to the reconstituted owners' society post-OC is the item to confirm.
Source: government filings, registered documents
LOW
Floor renumber disclosed in the agreement (marketed 16th = 15th from ground)
DocumentedThe building's flat/floor numbering runs ~1 ahead of the count-from-ground floor number, disclosed in the agreement.
A modest, disclosed floor-numbering offset — low impact, but every valuer/lender must redo the reconciliation; run the C47 gap-test before any sale-above-sanction reading.
Source: registered documents
LOW
Civil Aviation height No-Objection Certificate required before further Commencement Certificate (status unknown)
DocumentedThe the building approval conditions the building height on a Civil Aviation (AAI) No-Objection Certificate.
A standard height-No-Objection Certificate condition for a Bandra tower — confirm it was obtained for the amended (taller) height.
Source: government filings
Five questions to ask before you commit
  1. Can we see the occupation certificate and the latest sanctioned plan for the built height?
  2. From which floor does the sea view clear the buildings in front — and what is sanctioned to come up there?
  3. How long is car-lift retrieval at peak, and does the allotted bay take an SUV?
  4. When does the developer convey the new building and common areas to the reconstituted society?
  5. What extra area did the 17 members receive, and is any floor area (FSI) premium still outstanding to BMC?
Rexray — Real Estate X-Ray. This is a research view built from registered documents, government filings, and Rexray field analysis; it is not legal, financial, or investment advice. Verify every figure against the source documents before you transact.