Full Detailed Analysis →
Rexray.AI exists so buyers have complete, verified intelligence before the most significant financial decision of their lives.
Every finding is sourced. Every risk is disclosed. The decision remains yours.
The Rexray FVL Index evaluates every property across Fundamentals, Value, and Livability — converting document-level research into a structured, evidence-based verdict.
MarketedDeveloper CGI render
ActualPixeldo field photo (OC received)
P05 — Worli, Mumbai  ·  RERA P51900011592
Sugee Marina Bay
9 Sasmira Marg, Municipal Colony, Worli Shivaji Nagar, Mumbai 400030  ·  RERA plot 7,872.14 sqm  ·  DC Reg 33(7) MCGM municipal tenanted redevelopment  ·  Occupation Certificate (OC) received June 2026
Developer Brand
Sugee
Registered Promoter
Saumya Buildcon Private Limited
Land Ownership
Government — MCGM land, no executed lease deed
RERA Possession
30 June 2026 — OC received
⚠ Who You're Contracting With: Saumya Buildcon Private Limited (Sugee Group SPV) — not "Sugee"
Most critical misrepresented + material finding
The "freehold" claim is false on every registered document — the city still owns this land and no lease has even been signed.
Critical Misrepresented ×2.0
On-Time Delivery Risk Low Delivered — OC received June 2026 · but the 3.5yr delay over a 9yr project is the confirmed delay-by-design case in our analysis
F
Fundamentals The foundation — title clarity, approvals, developer compliance, and whether you get possession on time
· Land Ownership: Government land — former New Municipal Labour Camp, property card still in MCGM name; development rights under DC 33(7) only, marketed as "freehold." Prerna CHS is a proposed lessee and the lease deed was never executed (SSP Legal Para 11). Critical
· Land Ownership: MCGM holds an active lien on 1,459.89 sqm of the sale plot — balance capitalised value unpaid. This is the remaining critical deal-breaker until a post-OC title check confirms clearance. Critical
· Who You're Contracting With: Registered promoter is Saumya Buildcon Private Limited (a Sugee Group SPV, signatory Nishant Deshmukh) — the brand on the hoarding is "Sugee," not the legal counterparty. Medium
· Builder Track Record: Sugee Group delivered — OC received June 2026 — but Extension 1 was applied 22 days after the Rehab Bldg 1 OC unlocked +8 PAP floors; 3.5yr delay over 9 years, never disclosed (delay-by-design, OC-confirmed). High
V
Value The deal — layout quality, views at handover, and whether the price is justified by what you actually receive
· Layout Quality: Preliminary 72–78% usable — below SeaKrest (86.6%), above Nautilus (~74%). Full layout-efficiency assessment pending room-dimension extraction; effective ₹/sqft computation blocked on the final score (registered ₹0.56 L/sqft). ⚠ Pending
· View at Handover (Unit 01, west-facing): Unit- and floor-dependent, not a blanket risk. Floors 38–45 are among the better-protected sea positions in the corridor — above the coastal-road wall, with an angular offset from the Police Colony to the NW and naval land buffering the far NW. Floors 10–37 are progressively exposed to the Khan Abdul Gaffar Khan (KAGK) Road coastal wall at ~250–350m — an existing, confirmed obstruction (30–40F towers already in place), not a future risk. Floor-dependent
· View at Handover (Unit 02, NW-facing): The north-facing window has a separate, specific risk — a plot ~50–75m to the NE has been in litigation for ~20 years; if it resolves, a tower could land directly in the north view. This does not affect Unit 01. (Adarsh Nagar, NE, affects north bedroom windows, not the main sea balcony.) Unit 02 only
· Non-RERA Carpet Area: No ghost-lobby finding recorded — the registered carpet is clean on present extraction. Clear
L
Livability The daily reality — commute, building density, neighbourhood character, and quality of services at possession
· Compound Density: ~31% of the compound is undisclosed — two rehab buildings (one OC'd), a 1,264 sqm municipal school and 1,190 sqm municipal housing reservation, none shown in marketing's standalone sea-face framing. Anchors the Sugee compound-density score of 38. High
· Neighbourhood at Handover: Grey RT1.4/ET1.4 blocks north and the CS 194 "R" reservation south are not yet identified; Adarsh Nagar (Adani highest bidder 2 Jun 2026, FSI 4) at ~400–600m NE affects north bedrooms, not the marquee balcony. Medium
· Rush Hour Commute: Sasmira Marg (18.30M) is the main access; peak-hour LOS assessment pending. ⚠ Pending
· Lift Wait Time: Lift configuration analysis pending. ⚠ Pending
View Corridor — 500m at Handover Subject anchored & pulsing · red Google pin
Worli corridor satellite — Rexray view-corridor intelligence
A
B
C
D
E
F
G
H
I
J
K
L
M
Sugee Marina Bay — subject D Worli Police Colony — affects Bay A Siddharth Nagar Slum Rehabilitation Authority (SRA) C BDD Chawls E Sumitomo — Bombay Dyeing F Lodha — N of DP Road K Birla Century 10-acre M Oberoi Mall commercial
01 Provide a post-OC title search confirming the MCGM lien on 1,459.89 sqm has been cleared (capitalised value paid).
02 When will the MCGM–society lease deed actually be executed, and on what terms?
03 What is the timeline and height for Rehab Building No.2, and how will its construction affect residents now in occupation?
04 Provide actual maintenance charges levied to date against the uncapped Sale Agreement Clause 13.2.
05 What is the school reservation's construction timeline on the compound?
Rexray Verdict
Investigate
OC received June 2026 removes all construction and delivery risk and lifts the old "Skip — Revisit on OC" deal-breaker. But three critical findings stand — "freehold" land the city still owns, 53 floors marketed against 45 built and certified, and an active MCGM lien on a fifth of the sale plot. Get a clean post-OC title check before committing; the view is unit- and floor-dependent, not a blanket risk — for west-facing Unit 01, upper floors (38–45) are among the better-protected sea positions, while floors 10–37 face the existing coastal-road wall due west.
⚑ Active title encumbrance — an MCGM lien on 1,459.89 sqm of the sale plot with no confirmed removal timeline; needs a post-OC title check to confirm clearance.
Rexray FVL Index  ·  Provisional
F Weak 4.5
V Medium 5.5
L Medium 5.5
FVL Overall  (40·40·20) 5.1
Verdict Guide
Buy Risks exist but are addressable or consciously accepted
Shortlist Strong overall; 1–2 issues require conscious acceptance
Investigate Material gaps — get developer answers before committing
Skip Critical undisclosed risks with no available remedy
Skip — Revisit on OC Delivery risk too high; revisit when OC is received