Lower Parel, marketed as Worli — freehold, but five years stalled · RERA P51900032251

Raheja Imperia II plot outlined on the Rexray View MapYour plot on the 2032 skyline · tap for context
Overall Score5.4/10as of 07/26
Flags none

The south view is real. The Worli address is not. And 0 of 66 slabs are cast.

The 5 things that decide it tap to jump
FVL — Rexray's index · F Fundamentals · V Value · L Livability · each pillar is the average of its scored attributes, scored 0–10: Weak (<4) · Mixed (4–6) · Fair (6–7.5) · Strong (7.5+) · the verdict is set separately, by hard-stop rules · Scoring Methodology →
The plot & what surrounds it — at 2032
Rexray View Map: Raheja Imperia II and its surrounding development modelled at 2032
Raheja Imperia II — plot boundaryResidentialCommercialFuture confirmed development (layout speculative)Existing Building
Rexray View Map — every surrounding mass is modelled from sanctioned or filed data at possession-horizon build-out. The red boundary marks the Raheja Imperia II plot; the coloured blocks around it are the neighbouring residential, commercial, and rehabilitation development at build-out. This is the density the Livability score is measuring.

Pillar scores are provisional roll-ups derived from the 16 attribute scores · FVL numeric scoring pending corpus-wide

Five questions to ask before you commit
  1. Show me the 15/04/2025 amended municipal building approval plan and the 17/04/2025 commencement certificate (Commencement Certificate) — is the 63-to-77-floor uplift fully sanctioned, and to what level can you build today?
  2. Given 5 years produced 2 basements and 2 podiums, walk me through the construction programme that delivers ~70 levels by December 2029.
  3. What exactly rises on the MHADA rehab parcel at the gate and on the Prakash Mills plot — heights and start dates?
  4. What are the last three registered prices versus the price quoted to me — all-in?
  5. When did Imperia I get its occupancy certificate (OC), and what do its residents say about water, lifts and the club?
Analyst's Read

The fundamentals split cleanly: freehold mill-land title and a delivered sister tower on one side; on the other, five construction years that produced a part-built podium while the envelope was pushed from 63 to 77 floors, a 'Worli' label the documents contradict, a marketed sea view the project's own first tower blocks, and MHADA rehab housing coming up at the gate undisclosed. Nothing here is disqualifying — but the burden of proof on the December-2029 promise now sits with the developer, and the two documents that carry it (the Apr-2025 amended municipal building approval (IOD) and CC) remain unproduced. INVESTIGATE.

Want a Rexray on a different project?
Tell us which Worli–Lower Parel tower to analyse next, and we’ll email you the report the moment it’s live.

One email when your report’s ready. No spam, ever.

Got it.

Rexray — Real Estate X-Ray · rendered from the registered-document analysis the chat and X-Ray page read.
Source tagsREG registered docs · GOV government · REXRAY field intel · SEC verified secondary · MKT marketing (documents claims, never verifies).