Homes start on the sixth floor, above five levels of machine-parked cars · RERA P51900049616

Twenty-one storeys of apartments, five of them full of cars

Pillar scores are provisional roll-ups derived from the 16 attribute scores · FVL numeric scoring pending across all properties
The delivery risk that dominates most of the Rexray set is simply absent here — the building is complete, occupation-certified and was finished inside its own deadline, on freehold land the developer owns outright. What is left is three structural questions and a hard living envelope. The questions are each answerable with one document: where the sanctioned residential rehabilitation area physically sits, which property supplied the imported sixth of the floor area, and whether the mortgage over three flats has been released. The envelope is not negotiable: six commercial floors below the homes, two lifts doing the work of three, one machine moving every car with no ramp behind it, twenty minutes to the coastal road down a one-way lane, and an outlook that two named towers will close by 2030. Against that sits an apartment plate that is the second most efficient in the portfolio, with nothing carved out of it and kitchens that ventilate properly.